Blizzard blue warning: there are heavy blizzards in parts of Shanxi, Hebei and other places.
Cctv newsThe Central Meteorological Observatory continued to issue a blue warning of blizzard at 18: 00 on December 9:
It is estimated that from 20: 00 on December 9 to 20: 00 on December 11, there will be heavy snowstorms in parts of central and northern Shaanxi, central and southern Shanxi, southern Hebei, northern Henan, central and northern Shandong, eastern Liaoning, and southeastern Jilin. The newly added snow depth in these areas is 5-10 cm, and the local area is 12-15 cm. The main snowfall period is 10 days.
It is estimated that there will be heavy snow in parts of central and northern Shaanxi and central and southern Shanxi from 20: 00 on December 9 to 20: 00 on December 10, among which there will be heavy snow (10 ~ 12 mm) in central and southern Shanxi. The depth of newly added snow in some areas above is 4 ~ 6 cm, and the local area can reach more than 8 cm.
It is estimated that there will be heavy snow in parts of central Shaanxi, south-central Shanxi, southern Hebei, northern Henan, north-central Shandong, eastern Liaoning and southeastern Jilin from 20: 00 on December 10 to 20: 00 on December 11, among which there will be heavy snow (10 ~ 18 mm) in parts of southern Shanxi, southern Hebei, northern Henan and eastern Liaoning. The depth of newly added snow in some areas above is 5-10 cm, and the local area can reach more than 12 cm.
Defense guide:
1. The government and relevant departments shall, in accordance with their duties, make preparations for snow disaster prevention and freezing injury prevention;
2 transportation, railway, electric power, communications and other departments should carry out road, railway and line inspection and maintenance, and do a good job in road cleaning and snow melting;
3. Pedestrians should pay attention to cold prevention and anti-skid, drivers should drive carefully, and vehicles should take anti-skid measures;
4. Farming and pastoral areas and breeding industries should reserve feed and prepare for snow disaster prevention and freezing injury prevention;
5. Reinforce temporary structures that are easily crushed by snow, such as scaffolding.